Regulatory Information - SCE Load Profiles

The data files in this section are static load profiles for 2024. Each file is a rate group annual profile developed using a three-year average of historical rate group load profiles. Static Load Profiles are produced for 11 separate groups in advance of the target year and use the previous three years with complete data. The last class average load profile used is a two-year lag of the target year. Refer to the methodology of creating static load profiles for a description of the estimation process.

On May 18, 1998, SCE began implementing dynamic load profiles in place of static profiles for residential (Domestic Single/Multiple), Small Commercial (GS-1), and medium commercial/industrial (GS-2) customers. As of that date, only dynamic profiles should be used for billing or settlement for these three rate groups.

All SCE rate group load profiles are reported in Pacific Standard Time (PST), with hourly values recorded in kW.

2024 Static Load Profiles
Customer Class (Rate Group)Load Profile Id (text Files)DescriptionRate Schedules
DomesticDOM-S/MDomestic Single/MultipleD-CARE, D-CARE-SDP, D-CARE-SDP-O, D-FERA, D-FERA-SDP, D-FERA-SDP-O, D-PG-S, D-SDP, D-SDP-O, DE, DE-FERA, DE-FERA-SDP, DE-FERA-SDPO, DE-SDP, DE-SDP-O, DOMESTIC, TD-4-C-SDP, TD-4-C-SO, TD-4-F-SDP, TD-4-F-SO, TD-5-C-SDP, TD-5-C-SO, TD-5-F-SDP, TD-5-F-SO, TD-A-C-SDP, TD-A-C-SO, TD-A-F-SDP, TD-A-F-SO, TD-B-C-SDP, TD-B-C-SO, TD-B-F-SDP, TD-B-F-SO, TD-P-C-SDP, TD-P-F-SDP, TDE-A-F-SDP, TOU-D-1-P, TOU-D-1-P-C, TOU-D-4, TOU-D-4-C, TOU-D-4-F, TOU-D-4-SDP, TOU-D-4-SDPO, TOU-D-5, TOU-D-5-C, TOU-D-5-F, TOU-D-5-SDP, TOU-D-5-SDPO, TOU-D-A, TOU-D-A-C, TOU-D-A-F, TOU-D-A-SDP, TOU-D-A-SDPO, TOU-D-B, TOU-D-B-C, TOU-D-B-F, TOU-D-B-SDP, TOU-D-B-SDPO, TOU-D-P-C, TOU-D-P-C-SO, TOU-D-P-F, TOU-D-P-SDP, TOU-D-P-SDPO, TOU-D-PRIME, TOU-D-T, TOU-D-T-CARE, TOU-D-T-SDP, TOU-D-T-SDPO, TOU-DE-4, TOU-DE-4-F, TOU-DE-4-SDP, TOU-DE-5, TOU-DE-5-F, TOU-DE-5-SDP, TOU-DE-A, TOU-DE-A-SDP, TOU-DE-B, TOU-DE-B-SDP, TOU-DE-P-SDP, TOU-DE-PRIME, TOU-DE-T, TOU-DE-T-SDP, TOU-DE4-SDPO, TOU-DE5-SDPO, TOU-DEA-SDPO, TOU-DEB-SDPO, TOU-DEP-SDPO, TOU-DET-SDPO, TOU-DT-C-SDP, TOU-DT-C-SO, TOU-EV-1
DomesticDOM-MMMaster-MeteredDM, DM-CARE, DMS-1, DMS-2, DMS-3
LSMPGS-1General Service, Non-demand Metered, Small CommercialGS-1, GS-1-CIF, GS-1-SCE, TGS1-D-RTP, TGS1-D-RTP-S, TGS1-RTP, TOU-EV-3-A, TOU-EV-3-B, TOU-EV-7-D, TOU-EV-7-E, TOU-GS-1-C-S, TOU-GS1A, TOU-GS1A-AE, TOU-GS1A-C, TOU-GS1B, TOU-GS1B-AE, TOU-GS1B-S, TOU-GS1D, TOU-GS1D-AE, TOU-GS1D-C, TOU-GS1D-S, TOU-GS1E, TOU-GS1E-AE, TOU-GS1E-C, TOU-GS1ES
LSMPTC-1Traffic ControlTC-1
LSMPWTRWireless Technology (WIRETECH) WTR 
LSMPGS-2General Service, Demand Metered, Medium Commercial/IndustrialGS-2, GS-2-SCE, GS-2/GS1, TGS2-D-RTP, TOU-EV-4, TOU-EV-8, TOU-GS2-R-S, TOU-GS2A, TOU-GS2A-AE, TOU-GS2A-C, TOU-GS2B, TOU-GS2B-AE, TOU-GS2B-C, TOU-GS2B-S, TOU-GS2B-SAE, TOU-GS2D, TOU-GS2D-AE, TOU-GS2D-AEC, TOU-GS2D-C, TOU-GS2D-EDW, TOU-GS2D-S, TOU-GS2D-SAE, TOU-GS2E, TOU-GS2E-AE, TOU-GS2E-AEC, TOU-GS2E-C, TOU-GS2R, TOU-GS2R-AE, TOU-GS2R-C
LSMPTOU-GSGeneral Service, Time-of-Use, Medium Commercial/IndustrialTGS3-CPP, TGS3-D-RTP, TOU-GS3-B, TOU-GS3-B-C, TOU-GS3-BAES, TOU-GS3-D, TOU-GS3-D-C, TOU-GS3-D-S, TOU-GS3-DAES, TOU-GS3-DSCE, TOU-GS3-E, TOU-GS3-R, TOU-GS3A-AE, TOU-GS3B-AE, TOU-GS3D-AE, TOU-GS3D-EDW, TOU-GS3E-AE, TOU-GS3R-AE, TOU-GS3R-S
AG&PTOU-PA-2Agriculture & Pumping, Time-of-UseTOU-PA2A, TOU-PA2B, TOU-PA2D, TOU-PA2D-RTP, TOU-PA2D-S, TOU-PA2E, TPA2D-5T8, TPA2E-5T8
AG&PTOU-PA-3Agriculture & Pumping, Time-of-UseTOU-PA3-A-S, TOU-PA3A, TOU-PA3B, TOU-PA3B-S, TOU-PA3D, TOU-PA3D-S, TOU-PA3E, TPA3-D-RTP, TPA3D-5T8, TPA3E-5T8
NOTE: RATE SCHEDULE AND VOLTAGE (KV) LEVEL DETERMINE LARGE POWER LOAD PROFILE ID.
Large PowerTOU8-SECGeneral Service, Time-of-Use,Large Power(>500 kW), Secondary Voltage
(Below 2 kv)
MARCH-AFB-D, TOU-8-A-S, TOU-8-AE-S, TOU-8-B, TOU-8-B-APSE, TOU-8-CPP, TOU-8-D, TOU-8-D-APSE, TOU-8-D-EDW, TOU-8-D-RTP, TOU-8-E, TOU-8-E-APSE, TOU-8-R, TOU-8-R-APSE, TOU-8-S, TOU-8-S-D, TOU-8-S-D-AE, TOU-EV-6, TOU-EV-9, TOU8-D-RTP-S
Large PowerTOU8-PRIGeneral Service, Time-of-Use,Large Power (>500 kW), Primary Voltage
(2 kv - 50 kv)
MARCH-AFB-D, TOU-8-A-S, TOU-8-AE-S, TOU-8-B, TOU-8-B-APSE, TOU-8-CPP, TOU-8-D, TOU-8-D-APSE, TOU-8-D-EDW, TOU-8-D-RTP, TOU-8-E, TOU-8-E-APSE, TOU-8-R, TOU-8-R-APSE, TOU-8-S, TOU-8-S-D, TOU-8-S-D-AE, TOU-EV-6, TOU-EV-9, TOU8-D-RTP-S
Large PowerTOU8-SUBGeneral Service, Time-of-Use,Large Power (>500 kW), Sub-Transmission Voltage
(Above 50 kv)
MARCH-AFB-D, TOU-8-A-S, TOU-8-AE-S, TOU-8-B, TOU-8-B-APSE, TOU-8-CPP, TOU-8-D, TOU-8-D-APSE, TOU-8-D-EDW, TOU-8-D-RTP, TOU-8-E, TOU-8-E-APSE, TOU-8-R, TOU-8-R-APSE, TOU-8-S, TOU-8-S-D, TOU-8-S-D-AE, TOU-EV-6, TOU-EV-9, TOU8-D-RTP-S
Street LightingSt-LtngStreet and Area LightingAL-2, AL-2-F, DWL-A, DWL-B, DWL-C, LS-1-ALLNITE, LS-1-MIDNITE, LS-1-TAP, LS-2, LS-2-4, LS-2-B, LS-3, LS-3-B, OL-1-ALLNITE

If you have any questions regarding SCE load profiling, please contact Cyrus Sorooshian at SCE.